Dan coulstring
Member
- Location
 - Maine
 
200 amp meter/pwr dist meter feeding manufactured home and garage. I am being told by ahj that when the foundation is poured that gec to the panel in the house and garage  must be tied to a CEE. Anyone know of NEC or local codes that require this. I thought I could use any of the methods in 250.52
	
		
			
		
		
	
				
			
			
				Last edited: 
			
		
	
								
								
									
	
		
			
		
		
	
	
	
		
			
		
		
	
								
							
							
				