charging for a trench

Status
Not open for further replies.
I guess it just doesn't matter, cause it just doesn't, I will just sit back and Shut up
 
electricalperson said:
so if i have to dig a 100 foot trench 18 inches deep do you people think 10 dollars a foot is a good price or too expensive?
Go 20" deep so you have 18" to the top of the conduit.:smile:

All sand here but we get underground inspection on everything. If I could get an inspection around noon then I could back fill the same day and a grand for that is about right.
 
chris kennedy said:
Go 20" deep so you have 18" to the top of the conduit.:smile:

All sand here but we get underground inspection on everything. If I could get an inspection around noon then I could back fill the same day and a grand for that is about right.
i always tell customers 24" when they say they will trench, their tape measure seems different than mine, 24" usually will make the 20" rule.
 
480sparky said:
Absolutely your charge more. You need specialized equipement, so it costs more.

Here's what my spreadsheet says:

Width x Depth
10" x 12" $5.31
12" x 12" $5.96
18" x 12" $6.77
24" x 12" $7.39
10" x 18" $6.27
12" x 18" $6.88
18" x 18" $7.69
24" x 18" $8.33
10" x 24" $6.69
12" x 24" $7.36
18" x 24" $8.17
24" x 24" $8.83
10" x 30" $7.22
12" x 30" $7.86
18" x 30" $8.83
24" x 30" $9.45
10" x 36" $7.56
12" x 36" $8.51
18" x 36" $9.45
24" x 36" $10.09
12" x 40" $8.51
18" x 40" $9.45
24" x 40" $10.41
30" x 40" $11.35
12" x 48" $9.45
18" x 48" $10.41
24" x 48" $11.35
30" x 48" $13.51
18" x 54" $11.05
24" x 54" $11.99
30" x 54" $13.85
36" x 54" $15.10
18" x 60" $14.42
24" x 60" $16.26
30" x 60" $18.00
36" x 60" $21.64

These prices must be per C. Same pricing my competition used!


Best Wishes Everyone
 
Sparkyrob11 said:
If someone can afford to pay an electrician to dig, you're not charging enough.:wink:

I agree.

That is the one part of doing electrical work that the HO is capable of doing. Just call me when the trench is done.
 
HighWirey said:
These prices must be per C....
Per hundred feet???
roger3829 said:
I agree.

That is the one part of doing electrical work that the HO is capable of doing. Just call me when the trench is done.
But, work is work, and work means money. If I'm asked to dig a trench, I dig it, at a price that produces a profit. How many painters would let HOs do the primer coat?
 
Last edited: