I am in the process on installing a 3 phase 208 volt 3200 amp service for a shopping center. Currently I have installed 8 sets of 750 kcmil alluminum underground from a pad mount transformer. 5 sets to a 2000 amp main disconnect and 3 sets for a 1200 amp main disconnect.
i have terminated all the conductors at the transformer and both main disconnects. These were all black conductors that were color coded with tape and although I am very confident that all of the color coding was done correctly, I would like to double check the color coding just to be sure that everything is correct before the utility company installs their primaries. My question is, what is the best method to test for continuity between phases and from each phase to neutral at the disconnects? Obviously a standard tester will read continuity due to the windings from the transformer so what do you recommend? Thank you
i have terminated all the conductors at the transformer and both main disconnects. These were all black conductors that were color coded with tape and although I am very confident that all of the color coding was done correctly, I would like to double check the color coding just to be sure that everything is correct before the utility company installs their primaries. My question is, what is the best method to test for continuity between phases and from each phase to neutral at the disconnects? Obviously a standard tester will read continuity due to the windings from the transformer so what do you recommend? Thank you