I have a project for a small manufacturing facility. They had 2 chillers running as a single tandem system for process piping. One failed and they're now replacing it with another (same size), but now they want to run them lead/lag. Old system is fed from 400a breaker in a parallel set to a single disco then paralleled into the first chiller where the second feeders then break away. I believe I need to replace the 400a breaker in the MDP with 2 - 200a and 2 discos to separate the parallel feeders now that the units will no longer run in tandem. Is this assumption correct?