I am aware that if you want run more than one circuit to an outbuilding you most likely will need to install a sub panel with ground rods according to NEC.
But what about to a non-structure, say a post outside. For instance if a customer wanted two EV chargers and a 120v receptacle on a post in their driveway would it be compliant to run all three circuits separately to the equipment? Or would a sub panel be needed? Practicality aside.
Thanks