Clarification Sought

Merry Christmas
Status
Not open for further replies.
ibew441dc said:
It is obvious to me that your own personal experience with MWBCs has made you somewhat emotional and unable to change with the next generation. You will be weeded out like all bad habits. Again I will state code reference to you. Article 90.1(A)(B)&(C) were written so that people like you do not do things hypothetically and will ensure a safe installation.
There is no hypothetical about it I am quoting REAL WORLD. BTW what is the color of the sky in your world??
 
ibew441dc said:
You will be weeded out like all bad habits.

If I recall correctly, that's what we in the electrical field call a mixed metaphore. I wonder if Bob will enjoy deleting all these offtopics? :)
 
Bob knows there are too many electricians out there that dont understand the mwbc phasing and a little education goes a long way. This is life threatening basics here and if you ever did service work you would know that it is violated all the time. Pumping 40 amps on a 12 wire neutral with no ocp. This new code requirement will save many lives in the longrun by simplifying it for the untrained.
 
quogueelectric said:
This is life threatening basics here and if you ever did service work you would know that it is violated all the time.

Preaching to the choir. See my thread on [im]proper mwbcs. I spent a day cleaning up one of those messes.
 
Status
Not open for further replies.
Top