is it permissible to have gasketed form 7 fittings in cl 1 or 2 locations, i thought all fittings had to be gua, threaded covers , also some seal-offs are oversized , is their a way to visually inspect reducers to see if they are listed or expl. proof i have not seen any? also there are 4 bulletin 800 gasketed abb plastic encl. @ each unit with hand selector switches(120v vessel lights) which have contact blocks in and no sealoffs in conduit run is this acceptable?
this was engineered off-site by third party and hired us to just connect conduits together and pull wires coiled up to respective locations (not inspect job.) just looking to cover my butt.
this was engineered off-site by third party and hired us to just connect conduits together and pull wires coiled up to respective locations (not inspect job.) just looking to cover my butt.