I have a job installing some VFD's for motors in a sewage treatment plant.
The room is Class 1 Div 2.
The motors are connected with AL conduit drooping from the ceiling to a gasketed malleable tee with a nipple to a floor flange for support. and LFMC to the motor.
The motor is an explosion proof motor.
We want to cut the conduits in the ceiling and install conduits to another room where the VFD's will be located. Seals at the boundaries.
We will be installing new conduits for three drops to the motors because of corrosion.
Questions,
The room is Class 1 Div 2.
The motors are connected with AL conduit drooping from the ceiling to a gasketed malleable tee with a nipple to a floor flange for support. and LFMC to the motor.
The motor is an explosion proof motor.
We want to cut the conduits in the ceiling and install conduits to another room where the VFD's will be located. Seals at the boundaries.
We will be installing new conduits for three drops to the motors because of corrosion.
Questions,
- Can we install gasketed screw cover junction boxes and myers hubs in the ceiling of a CL1 Div2 area or do they have to be explosion proof?
- Can we use LFMC from a gasketed malleable LB at the motor? We will not be using the tee and floor flange method, we will be building a strut support.