jcook980
Member
- Location
- Gresham, Oregon
- Occupation
- Electrical Engineer
I have a water utility client who refuses to bond their metal underground water piping to the grounding electrode system at their pumping stations due to bad experiences with stray currents causing corrosion. They claim to be self inspected and exempt from the NEC. While I understand their issue, I am very uncomfortable with their decision not to bond the water lines in their pumping stations.
Comments?