Forgive me if this has been discussed before. I couldn't find it in a search.
I am in a healthcare setting and we are required to transfer power within 10 seconds which is tested monthly and documented. We can't always meet that due to our closed transition switches. Is there any exceptions to the 10 second rule that would allow for the syncing of the two power sources during testing? We could open normal power and will meet the time. However, there are many instances where it is not practical to do so.
When we go over, the timing is generally around 11-18 seconds. Any assistance would be appreciated. Thank you
I am in a healthcare setting and we are required to transfer power within 10 seconds which is tested monthly and documented. We can't always meet that due to our closed transition switches. Is there any exceptions to the 10 second rule that would allow for the syncing of the two power sources during testing? We could open normal power and will meet the time. However, there are many instances where it is not practical to do so.
When we go over, the timing is generally around 11-18 seconds. Any assistance would be appreciated. Thank you