i have a situation where i have two services.one service 208/120v poco service,the other 480v 3 wire from cogen plant.the 208 service has been upgraded from 400a to 800a,the 480v 3 wire service has been slightly modified.this is a stand alone building in a residential/commercial complex.how do i legally bond the 480v system? the code is 2005 nec with 2007 nec amendments.