OK, here's my first post. I have a contractor who has stripped about 40' of MC cable jacket and transitioned from MC to a rigid coupling to an emt connector to emt. The emt runs about 40'. Can anybody help me find a violation(s). I've checked with manufactures and have been told the reason they don't make such a fitting is due to the probability of the conductors getting damaged.