Hello All. Two questions.
1. From the sump pump control panel and for thecircuits going back to the same panel(EMCC) would there be an issue combiningthose circuits in one conduit?
2. From the sump pump and ejector is the pumpswhere further from the control panel would you also be able to combine thosecircuits in one pipe to each control panel?
Thanks.
1. From the sump pump control panel and for thecircuits going back to the same panel(EMCC) would there be an issue combiningthose circuits in one conduit?
2. From the sump pump and ejector is the pumpswhere further from the control panel would you also be able to combine thosecircuits in one pipe to each control panel?
Thanks.