My Dad is building a 4 spot commercial building. All will be metered seperatly. He will be leasing them out to small businesses. He wants to put a 200 amp in three spots and a 100 amp in one spot for a office. The gear will be mounted on the building outside. Not knowing what kind of load will be on this building other that service size per spot what size main service to the whole building should be put in.