Commercial Renovation 15,000 Sq. ft. space, new electrical

Status
Not open for further replies.

ESM Engineers

Member
Location
Houston, TX
I am debating what would be a more realistic cost effective method to renovate an office building. I would like to demo all LV panels and install new; however I will need to salvage 75% of receptacles. Do I call for electricians to salvage and trace circuit to panels then disconnect for new install or Demo the entire run and re-install per new design? Materials Vs. Labor?
 
What do you mean by "salvage 75% of receptacles", physically removing them and reusing them later?