ESM Engineers
Member
- Location
- Houston, TX
I am debating what would be a more realistic cost effective method to renovate an office building. I would like to demo all LV panels and install new; however I will need to salvage 75% of receptacles. Do I call for electricians to salvage and trace circuit to panels then disconnect for new install or Demo the entire run and re-install per new design? Materials Vs. Labor?