After hours of searching I figure it's time to ask those who know. Is it ever legal to tie the handles of single-pole breakers together to make 2 or 3 pole devices?
We are in the process of a multi-city EMS installation project. Most sites have a manufactured load center that comes shipped with all the breaker spaces filled, resulting in 10 to 15 unused 20 amp sp breakers. Most are snap-in Square D with the toggles drilled, just waiting for a roll pin to interconnect them as multiple pole units.
I worked for an electrician years ago that did this regularly, but I always questioned the legality.
We are in the process of a multi-city EMS installation project. Most sites have a manufactured load center that comes shipped with all the breaker spaces filled, resulting in 10 to 15 unused 20 amp sp breakers. Most are snap-in Square D with the toggles drilled, just waiting for a roll pin to interconnect them as multiple pole units.