Alwayslearningelec

Senior Member
Location
NJ
Occupation
Estimator
When it says "Coordinate with ConEd and building managment/engineer" for electrical service shutdown, what is usually required on an electricians stand point? Obviously the work will be done on OT but I guess there is paperwork etc. that has to be filed. It is a 3000a switch that is being shutdown. THANKS A LOT!!!!
 