Doing a small condo in MA consisting of 3 floors and something like a dozen units each of which I intend to run SER cable to from a meter center in the basement. Within the unit I intend to run Romex. I know that this has traditionally been allowed in MA but when I've done work in RI, we used MC cable. Where is this requirement in the NEC spelled out?
Just want to make sure nothing has changed and in general what drives the requirements.
Also are the rules the same within the units as they are outside of the units such as in the hallways. Can Romex be used for both?