I was always under impression, Not to exceed 360 before pullbox or such,
But I was Demo'ing a conduit, Needed to "Remove back to Source" Run was 200 feet and zig zag like crazy cause of the Existing equipment they had to deal with to obtain the run. ( They definitely had to zig zag).
So I now have to pull wires out. I had to make sure in this run their was no pullbox or anything. So I follow the line down one floor across 200 feet and up 1 floor. Make it known it had No Pull boxes. It was one run. So I was just curious on the Degree count. It came out to 970 degrees with no pull box. It worked. Pulled in, and out. Is this legal. I would rather no put pull boxes in anyway, Just so I can point to point pull.
Was amazed at that degree count
But I was Demo'ing a conduit, Needed to "Remove back to Source" Run was 200 feet and zig zag like crazy cause of the Existing equipment they had to deal with to obtain the run. ( They definitely had to zig zag).
So I now have to pull wires out. I had to make sure in this run their was no pullbox or anything. So I follow the line down one floor across 200 feet and up 1 floor. Make it known it had No Pull boxes. It was one run. So I was just curious on the Degree count. It came out to 970 degrees with no pull box. It worked. Pulled in, and out. Is this legal. I would rather no put pull boxes in anyway, Just so I can point to point pull.
Was amazed at that degree count