I have a brand new install and thought there would be a code requirement to cap unused conduit and provide a pull string. I'm not finding it in the code. If I had found it, my job would be easy, so I'm trying here to see if there is a section I'm missing. I'm sure the topic will degenerate into what is best (obviously I know it is best), but if we can keep it on point that would be ideal. I wanted to know if there was a code section on point that required:
- Newly installed conduits to be capped?
- Newly installed conduits to have pull strings?
- Newly installed conduits to have labeling?