Natfuelbilll
Senior Member
Is a RGS conduit installed and then a concrete wall poured around it making it cast in place complete with regard to 2 hr fire stop?
Or must I install a fire stopping split sleeve around the conduit and then pour the wall?
Or must I install a fire stopping split sleeve around the conduit and then pour the wall?