iam trying to use as much of the base building 3/4 & 1'' branch ckt conduits as i can i want to do a good per code job but my company was low bidder and we can not run more conduits and there is not time flr is partial occupied any good suggestions as to how i can turn this job into a winning job with what i have to work with with out code violations