iam trying to use as much of the base building 3/4 & 1'' branch ckt  conduits as i can  i want to do a good per code job  but my company was low bidder and  we can not  run more conduits  and there is not time flr is partial occupied  any good suggestions as to how i can turn this job into  a winning job with what i have to work with with out code  violations
	
		
			
		
		
	
				
			 
				