markebenson
Senior Member
- Location
- fl
Setting up a 6a 3 phase sub panel. Running 4awg. I am seeing that I can run 4 pcs of 4awg thhn in 1 inch emt. Now to add the ground will adding 1 pc of 10 awg put be over the limit to where I have to go up to 1-1/4 or would I make it with the 1". thx