We have the need to replace 13.8 kV switchgear (8 feeder circuits) with new gear. A steel plant in western New York with heavy snow and ice load on gable roof. We cannot interrupt power to any of the operations during construction, so project activities need to occur during normal plant operations. We desire to run new 4' or 6" conduits on the outside wall of building so no interference to production operation occurs. We will take a one-week outage to tie in the new circuits. My question is how durable will the conduits running the sides of the building be with snow and ice falling from roof? Thanks, Pat