Customer is trenching approximately 200 to 300 feet between main panel and where electric well sub-panel will be installed. Apparently the septic tank is between the two locations, and customer feels over the top is easier than just upstream of the septic tank. I would much rather him go upstream of the tank and hand dig under the sewer. That way 100% of the conduit will have 18" of cover, and I won't be forced to have a small run of rigid where it passes over the tank. The sub-panel will be small, but I hate to size the conduit to be just large enough. I don't have a hydraulic bender, so I'm very limited in what size rigid I could use. Yeah, I could always buy a 1 1/4" EMT / 1" rigid bender, but I'm light, and wouldn't want to bend the 1" rigid. Plus, I feel that 1" is just too small.
Is there a code preventing the installation of conduit over a septic tank? Perhaps a building code?
Is there a code preventing the installation of conduit over a septic tank? Perhaps a building code?