alferz
New User
- Location
- Sacramento
- Occupation
- Electrician
I have a job where I am installing an EVSE via a hardwired connection through conduit. There is an existing 2 phase 20 amp circuit that terminates in an old work box on a sheetrock wall. What is the recommended way to install something that EMT or LiquidTite could connect to in this situation? Is there a metal box cover made for this application, or is removing the old work box, patching the drywall and installing a new metal box proud of the wall the only way?
	
		
			
		
		
	
				
			 
				
 
 
		
 
 
		 
 
		 .  Must be something they just started doing in the last couple months
.  Must be something they just started doing in the last couple months 

 
 
		

 
 
		