Happy Easter,
I am setting up my Enphase IQ Combiner 4 along with my 16 - Enphase IQ8+ Microinverters. Power is running from the grid to the Envoy, the Envoy is connected to the Installer Toolkit APP on my phone. The microinverters are uploaded on my APP. I am at the point in the set up wizard on the app where I need to set up the "production meter". It is advising me to turn on the 2 - PV circuit breakers.
I was wondering, would turning these breakers on be okay even though my POCO (Duke Energy) has not yet been out to give us their final approval? Thought that I would turn the breakers on long enough to set up the system.
Thanks for the help.
I am setting up my Enphase IQ Combiner 4 along with my 16 - Enphase IQ8+ Microinverters. Power is running from the grid to the Envoy, the Envoy is connected to the Installer Toolkit APP on my phone. The microinverters are uploaded on my APP. I am at the point in the set up wizard on the app where I need to set up the "production meter". It is advising me to turn on the 2 - PV circuit breakers.
I was wondering, would turning these breakers on be okay even though my POCO (Duke Energy) has not yet been out to give us their final approval? Thought that I would turn the breakers on long enough to set up the system.
Thanks for the help.