bphgravity
Senior Member
- Location
- Florida
Assume as 300A service with parallel 1/0 feeders installed in a metal wireway after the main disconnecting means.
From the wireway, 2 - 150A panelboards will be supplied via taps from the feeders.
For ease of discussion, I will only refer to one phase conductor. From each 150A panel will be one conductor for "A" phase. In the wireway are 2 parallel "A" phase conductors.
Do the two feeder tap "A" phase conductors have to terminate to both "A" phase feeder conductors, or can they each terminate to only one or the other, or can they terminate to one each?
I can put together a wiring diagram if necessary. Thanks for any comments.
From the wireway, 2 - 150A panelboards will be supplied via taps from the feeders.
For ease of discussion, I will only refer to one phase conductor. From each 150A panel will be one conductor for "A" phase. In the wireway are 2 parallel "A" phase conductors.
Do the two feeder tap "A" phase conductors have to terminate to both "A" phase feeder conductors, or can they each terminate to only one or the other, or can they terminate to one each?
I can put together a wiring diagram if necessary. Thanks for any comments.