transman2
Senior Member
- Location
- Brooklet,Ga.
250.50 says it requires the inclusion of at least 1 concrete encased electrode described in 250.52 A 3 in the grounding electrode system for buildings and stuctures. Is it required to ground the rebar in all of the seperated concrete footing that support a conveyor system and the footing are longer than 20 feet . Also is it required to install bond jumpers to the steel where it is attached together to form the conveyer system and if so where is it located in the code book. Thanks to all you guys that have helped me over the years answering my questions.