Electric_kool_aid
Member
- Location
- Washington
- Occupation
- Journeyman 02
So I have a strange situation, basically the customer ran the conduit himself, then hired me to finish the job. Obviously this is not how I would ever do this service
especially with a building this nice I would have prefer to do a recessed meter and run the conduit before the slab got poured. But we do the best we can. He originally ran the conduit to the wrong spot and had to relocate it. Power company signed off on the conduit and the location. However he ran into footing at the new location so the conduit was 18ā off the building. The only way I could make this work was to do this heinous offset. Heās ok with it but Iām worried this wonāt pass inspection due to clearance concerns. But I didnāt really have any other options other than hammering the footing out which I donāt want to be liable for any of that. Would love some feedback.