Saw something weird today and im curios what everyone else thinks, and il try to give as many details as possible. Been doing a residential service upgrade over the last two days, today was new panel, cut power and switch everything over. 200a meter main. 4 wire off the load side to a main lug panel. All gas appliances and no 3 wire 240v circuits. I took my meter out after everything was pulled, and the biggest detail i can think of is that i had the entire panel made up before metering everything for shorts, with separated neutrals and grounds in a main lug panel with the bonding screw removed, and the meter socket not made up yet with the exception of the wire going out to ground rods, you should not read continuity between neutral and ground bus bars? I was ringing out, by the time i did my brain was fried and i couldn't make sense of why it was happening.