It is a bit of a though problem. Not sure of the solution. It is so hard and expensive to wait around for an inspector getting no real work done. Then there are the inspectors that won't even remove the simplest cover. My brother is building a new house on Pudget Sound, but very rural and he's more than an hour and a ferry ride away and still working. He's acting as GC. He asked me to help him (long distance) with the temp power. First inspector that came out would not even take the cardboard meter blank off the Milbank combo panel and failed him since he couldn't see inside. In preperation for the next inspection, my brother took the cardboard meter cover off and just put garbage bag over the whole panel. It was a different inspector, but he passed him.