HecThor
Member
- Location
- Philippines
Hello All,
Just want to seek guidance in doing the title above, is there a section in the code prohibiting this? If none, is there any guidance in doing so? Buildings are 5 meters apart, Bldg A is 3 meters higher from Bldg B. The purpose of doing this is to save from expenses of doing a trench. Sorry I can't upload the picture, there's an error. Thanks in advance.
Just want to seek guidance in doing the title above, is there a section in the code prohibiting this? If none, is there any guidance in doing so? Buildings are 5 meters apart, Bldg A is 3 meters higher from Bldg B. The purpose of doing this is to save from expenses of doing a trench. Sorry I can't upload the picture, there's an error. Thanks in advance.