I have a pipe rack 250'+ that shares both elec and gas piping. Most of it was class 1 div 2. They have removed some of the gas venting for about 100' that caused the div 2 area. Now I have the boundry seals 100 feet from the new boundry. I 6+ 1inch pipes, so i would like not to have to pull all the wire back to add seals in the middle of this run. Could we just leave the area classified without the hazard being present? Any other solutions?