Contractor requested we have 120v power source at our manufacturing facility for new fire sprinkler alarms replacing current hydraulic ones. We do in house electrical and controls and I am trying to find out if this needs to be the only load on a dedicated breaker on a dedicated circuit or if I can tap into to a constant power source near by (outlets). Any help or code references to answer this question is welcome. Thanks
