This is an existing house which the original plans dont match what is in the field. Right now they have the whole house on the gen. The permit drawing, they had taken one of the panels out of the gen. so the calculations were okay, now we have a case wher we need to kow the highedt KW demand, here in South Florida usually is the cooling the highest during the peak summerWhat do you mean they only accept a letter from the poco?
If it was a new build it would have to be calculated by the procedure, how is this any different? How could you ever size a new house service because there is no poco to write a letter?