masterinbama
Senior Member
- Location
- Huntsville Alabama
I have a job where the customer wants to add 5 point of use water heaters 2 twelve kw 1 nine kw and 2 eight kw whats the demand for these heaters my code book is on another jobsight and i just need a rough calculation to know if I need to order material for a service upgrade I'm hoping the 200 amp service will be large enough because the 400amp meter sockets we have to use are very expensive and have a long delivery time