Can anyone direct me where and if the N.E.C. requires abandoned electrical systems to be demo'd if the service is disconnected from the power source?
In this case, the 480 volt service was disconnected from a warehouse but the 120/240 volt service was maintained for offices and misc. equipment. So the warehouse 480v equipment is not being used anymore because the use is more for storage.
The contractor wants to leave all 480 volt equipment intact. Any comment?
In this case, the 480 volt service was disconnected from a warehouse but the 120/240 volt service was maintained for offices and misc. equipment. So the warehouse 480v equipment is not being used anymore because the use is more for storage.