Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
Bidding a very large site job where there are at least 40 different structures being fed underground. It's A LOT of duct banks and large wire. Probably a lot of money in copper. Not sure if it has to be turned over to owner. GC wrote an RFI asking if all underground utilities can be abandoned in place. They replied they must all be removed in their entirety.
1. Would you actually estimate time to remove all those conductors from all the conduits? Asking because would that be what you would do if you got the job?
2. Would you just disconnect and safe off and let GC remove all utilities as they are digging up ground in all the areas? But then how would you handle being able to get the copper?
Thanks
1. Would you actually estimate time to remove all those conductors from all the conduits? Asking because would that be what you would do if you got the job?
2. Would you just disconnect and safe off and let GC remove all utilities as they are digging up ground in all the areas? But then how would you handle being able to get the copper?
Thanks