P powerplay Senior Member Location Canada Occupation Electrical Contractor Jul 15, 2012 #1 i was called about an subfeeder cable hit while they were excavating. A temporary patch has been made with access for connection inspection, but is there a direct burial splice kit for armoured aluminum 250KCMIL cable instead??