Would a gate motorized operator require a disconnect if the controller is not within site of the gate motorized operator (controller is inside an adjacent building and the gate motorized operator is located outside)? I am referring to 2002 NEC 430-102 (2002 NEC is applicable to this project). An example of the motorized gate operator to be procured can be found here: http://www.liftmaster.com/consumerweb/pdfdocs/0134850.pdf