Lead electrician was not so much challenging the plans, as he was curious to why the disconnect could be unfused when entering the building after more than 15 feet ( I believe that is what he said ).
30 Year Electrician vs. Solar Designer/Project Engineer, I take anything he says with great weight, as he has been doing this far longer than I have.
He made mention of service conductors, and I said, well that is probably why, as the conductors entering the building I believe are considered as feeders, which maybe is why there is an exception.
Can anyone shed some light on this so I can make good on my promise to "ask a few friends". Code references and explanation would be great in this instance.
30 Year Electrician vs. Solar Designer/Project Engineer, I take anything he says with great weight, as he has been doing this far longer than I have.
He made mention of service conductors, and I said, well that is probably why, as the conductors entering the building I believe are considered as feeders, which maybe is why there is an exception.
Can anyone shed some light on this so I can make good on my promise to "ask a few friends". Code references and explanation would be great in this instance.