Disconnect switch ground?

Status
Not open for further replies.

rrc14

Member
Location
Anchorage, AK
Occupation
Engineer
When installing a feeder (3-phase w/neutral & ground) from a main panel-board to a disconnect switch and a panel board in another building about 200 feet away ; Does the NEC require the disconnect switch to bonded to a ground rod at the disconnect switch location?
 

DavisIMI

Member
Is this a new building that this panelboard will supply or is it a exsting building with existing premises wiring?
 
Status
Not open for further replies.
Top