rrc14
Member
- Location
- Anchorage, AK
- Occupation
- Engineer
When installing a feeder (3-phase w/neutral & ground) from a main panel-board to a disconnect switch and a panel board in another building about 200 feet away ; Does the NEC require the disconnect switch to bonded to a ground rod at the disconnect switch location?