For tl;dr
Where do we draw the line between modifying furniture for usage in an existing space and requiring permit drawings?
-----------
A small suite (originally retail/recreational) is being converted into office space. The suite has ample outlets and no plans to alter the electrical system. My initial take was: “This could be grandfathered in without permits or design support, although a change in occupancy might trigger permit requirements depending on the AHJ. They could still ask for a full fit-out design.”
Then a question came up about powering desks. The furniture is essentially self-contained, designed to be plugged into outlets or powerwhipped to adjacent units. If they use or modify the furniture, would that change permit requirements?
Since the building’s electrical system isn’t being altered, I still lean toward no permits needed, though I'm cautious about how circuit loads are managed and if that will raise a concern to the AHJ.
It raises a broader question: how much can we reconfigure a space or power furniture within an existing space before crossing into permit territory?
What do you guys think?
Where do we draw the line between modifying furniture for usage in an existing space and requiring permit drawings?
-----------
A small suite (originally retail/recreational) is being converted into office space. The suite has ample outlets and no plans to alter the electrical system. My initial take was: “This could be grandfathered in without permits or design support, although a change in occupancy might trigger permit requirements depending on the AHJ. They could still ask for a full fit-out design.”
Then a question came up about powering desks. The furniture is essentially self-contained, designed to be plugged into outlets or powerwhipped to adjacent units. If they use or modify the furniture, would that change permit requirements?
Since the building’s electrical system isn’t being altered, I still lean toward no permits needed, though I'm cautious about how circuit loads are managed and if that will raise a concern to the AHJ.
It raises a broader question: how much can we reconfigure a space or power furniture within an existing space before crossing into permit territory?
What do you guys think?