725, License to do anything, JMO, I hate it , I seen it way abused and not adhered to, all the time.
90.3
Chapter 1-4 Applies generally to all electrical installations.
Chapter 5-7 Supplements or modifies Chapter 1-4.
Their is no wholesale waiver of 1-4 wire methods in 725, it is based on Chapter 1-4
electrical installations (see above) it ?Supplements or modifies Chapter1-4?.
When called out, if it's not called out then it defaults to 1-4! That the way I was taught!
Chapter 8 gets the wholesale don't follow 1-7.
Tell me now, correct me of my mislead thoughts; I've been meaning to talk to my old teacher and tell
them also of my Code Love! 
Let me convey to him that I was mis-taught.
I'm with Dennis 300.5 is in! Don't get stuck on the Table readthe Article.
_________________________________________________________________________________________
What bothers me is that this Class thing; is this only Roman numerals whenin classified area
andonly numerical numbers when not in Hazardous area/conditions?
Are we not talking about the same thing at all.
What is the the difference between 1,2,3 and I, II, III. With Class 1,2...this is in reference to these types of building structures. This type of Class(s) and there is not (is no mention of this)any mention in our 70 Code; it's a building code, reference. FYI Class only is in index in respects to Hazardous I,II, etc.
Schoolme please, I'm so Bored!!!!
Hmm, I'll bet 8 out of 10 electricians would fail Building Classification 1,2, and understanding their subdivisions.
More Fuel for the Mike Holt Submitting Machine!