This if for a post I made about a 80kw gen install on residential home. None NECA labor rate.
Project Tasks Breakdown:
1. Generator Installation
- Task: Setting up the 80 kW, 240 Volt diesel generator.
- Estimated Hours: 10 hours
- Labor Cost: 10 hours * $97.50/hour = $975
2. 400 Amp Main Breaker Disconnect Installation
- Task: Installing the 400 Amp main breaker disconnect next to the generator.
- Estimated Hours: 8 hours
- Labor Cost: 8 hours * $97.50/hour = $780
3. Trenching and Conduit Installation
- Task: Digging a 230-foot trench (24" deep) and installing 230 feet of 4" Schedule 40 PVC conduit.
- Estimated Hours: 20 hours
- Labor Cost: 20 hours * $97.50/hour = $1,950
4. Pulling and Installing Wire (300 KCMIL Aluminum XHHW)
- Task: Pulling and installing 920 feet of 300 KCMIL aluminum XHHW wire through the conduit.
- Estimated Hours: 20 hours
- Labor Cost: 20 hours * $97.50/hour = $1,950
5. Automatic Transfer Switch (ATS) Installation
- Task: Installing the 400 Amp Kohler ATS and making necessary connections to the power company J-box and house wiring.
- Estimated Hours: 12 hours
- Labor Cost: 12 hours * $97.50/hour = $1,170
6. Connecting to Power Company J-Box and House Wiring
- Task: Running 15 feet of wire from the ATS to the power company J-box and house wiring.
- Estimated Hours: 5 hours
- Labor Cost: 5 hours * $97.50/hour = $487.50
7. Miscellaneous Tasks and Setup
- Task: Miscellaneous tasks including setup, testing, and final adjustments.
- Estimated Hours: 5 hours
- Labor Cost: 5 hours * $97.50/hour = $487.50
Total Labor Hours and Costs
- Total Estimated Hours: 80 hours
- Total Labor Cost: $7,800
Materials Cost Breakdown
- 400 Amp Main Breaker Disconnect: $1,500
- 400 Amp ATS (Kohler): $4,000
- 4" Schedule 40 PVC Conduit:
- Price per foot: $5
- Total Length: 230 feet
- Total Cost: $1,150
- 300 KCMIL Aluminum XHHW Wire:
- Price per foot: $2.50
- Total Length: 230 feet x 4 conductors = 920 feet
- Total Cost: $2,300
- Miscellaneous Materials (connectors, grounding, etc.): $500
Additional Costs
- Permit Fee: $250
Total Estimated Cost
- Materials: $9,700
- Labor: $7,800
- Permit: $250
- Total Cost Before Profit: $17,750
Adding 10% Profit
- Profit: $1,775
- Total Cost Including Profit: $17,750 + $1,775 = $19,525
Final Summary
- Generator Installation: $975 (labor)
- Main Breaker Disconnect Installation: $780 (labor)
- Trenching and Conduit Installation: $1,950 (labor)
- Wire Pulling and Installation: $1,950 (labor)
- ATS Installation: $1,170 (labor)
- Connecting to Power Company J-Box and House Wiring: $487.50 (labor)
- Miscellaneous Tasks: $487.50 (labor)
- Total Labor Cost: $7,800
- Total Material Cost: $9,700
- Permit Fee: $250
- Profit (10%): $1,775
- Total Project Cost: $19,525