Steelhead
Senior Member
- Location
- Southeastern Wisconsin
- Occupation
- Industrial Maint/Journeyman
Hi guys,
I have to run an equipment bonding jumper from the frame of a machine to building steel. I want to sleeve the bonding jumper with a short (less than 5 feet) piece of EMT. Does the EMT have to be bonded? Could I get a code reference? The feed to the machine is all properly grounded and bonded to the EGC. This bonding I want to do is in addition to what was originally installed.
Thanks
I have to run an equipment bonding jumper from the frame of a machine to building steel. I want to sleeve the bonding jumper with a short (less than 5 feet) piece of EMT. Does the EMT have to be bonded? Could I get a code reference? The feed to the machine is all properly grounded and bonded to the EGC. This bonding I want to do is in addition to what was originally installed.
Thanks