I have several installations where a fusible service entrance rated manual transfer switch will be installed on some buildings where the existing main breaker may be larger than the maximum fuse size of the fusible switch.
The engineer on the job is requiring these existing larger main breakers be changed out to match the smaller fuse size of the transfer switch.
Is this a requirement of the NEC?
The engineer on the job is requiring these existing larger main breakers be changed out to match the smaller fuse size of the transfer switch.
Is this a requirement of the NEC?